Release order or PR

From: Irfan Ahmed (2013-11-14 00:26)

Dear All,
Please go through
the below data everything seems okay except when work order created from PM. I manually
created
Release order
and provide work order reference as well.
 
Is there
any way it will automatically create either release order or PR.
 
 
Asset No# 1 Monthly Job Plan No# Routes PM Contract WO NO# PO No#
   Inspection            
M1446 1M CRANERP542 Cranes-Inspection 1 M Crane Inspection 4017 1471370 HUL4234552
            1471371  
            1471372  
M2342 1M CRANERP500       1471373  
             

   
         
M3336 1M CRANERP11


From: Ian Wright (2013-11-14 08:45)

Add the materials to the job plan
From: MAXIMO@yahoogroups.com [mailto:MAXIMO@yahoogroups.com] On Behalf Of Irfan Ahmed
Sent: 14 November 2013 08:26
To: maximo@yahoogroups.com
Subject: [MAXIMO List] Release order or PR
Dear All,
Please go through the below data everything seems okay except when work order created from PM. I manually created
Release order and provide work order reference as well.
Is there any way it will automatically create either release order or PR.
Asset No#
1 Monthly
Job Plan No#
Routes
PM
Contract
WO NO#
PO No#
Inspection

M1446
1M
CRANERP542
Cranes-Inspection
1 M Crane Inspection
4017
1471370
HUL4234552

1471371

1471372
M2342
1M
CRANERP500
1471373



M3336
1M
CRANERP11






GDF SUEZ E&P UK Ltd (Company Number 3386464), registered in England and Wales with a registered office address at: 40 Holborn Viaduct, London, EC1N 2PB.
**************************************************************************************************************
This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed.
If you have received this email in error please notify the system manager.
**************************************************************************************************************


From: Irfan Ahmed (2013-11-14 02:48)

Dear All,
Instead of using the Blanket Contract I used Price Contract. By doing this change PR and PRLINE has been automatically display in 
work order plan tab(services) as I use standard services. However, In order to achieve this I manually change the work order status from APPR to Waiting on APPR and then APPR. 
Anyone give me idea how can I avoid this status changes.
Our scenario is system automatically creates APPR PR and APPR PO, without any human intervention
Thanks 
Ahmed
On Thursday, November 14, 2013 10:46 AM, Ian Wright <ian.wright@gdfsuezep.co.uk> wrote:

 
Add the materials to the job plan
 
From:MAXIMO@yahoogroups.com [mailto:MAXIMO@yahoogroups.com] On Behalf Of Irfan Ahmed
Sent: 14 November 2013 08:26
To: maximo@yahoogroups.com
Subject: [MAXIMO List] Release order or PR
 
 
Dear All,
 
Please go through the below data everything seems okay except when work order created from PM. I manually created
Release order and provide work order reference as well.
 
Is there any way it will automatically create either release order or PR.
 
 
Asset No# 1 Monthly Job Plan No# Routes PM Contract WO NO# PO No#
   Inspection            
M1446 1M CRANERP542 Cranes-Inspection 1 M Crane Inspection 4017 1471370 HUL4234552
            1471371  
            1471372  
M2342 1M CRANERP500       1471373  
             
 
 
 
 
 
 
 
M3336
1M
CRANERP11
 
 
 
 
 
       
     
 
 
 
 
 
 
 
 
 
 
 
         
GDF SUEZ E&P UK Ltd (Company Number 3386464), registered in England and Wales with a registered office address at: 40 Holborn Viaduct, London, EC1N 2PB.
****************************************************************************************************************************************************************************************
This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed.
If you have received this email in error please notify the system manager.
****************************************************************************************************************************************************************************************


From: Ian Wright (2013-11-14 10:55)

Go to your PM then hyperlink to the JOBPLAN associated with it
If there isn’t one create it
Add your standard services on the jop plan associated with PM



From: MAXIMO@yahoogroups.com [mailto:MAXIMO@yahoogroups.com] On Behalf Of Irfan Ahmed
Sent: 14 November 2013 10:48
To: MAXIMO@yahoogroups.com
Subject: Re: [MAXIMO List] Release order or PR


Dear All,

Instead of using the Blanket Contract I used Price Contract. By doing this change PR and PRLINE has been automatically display in
work order plan tab(services) as I use standard services. However, In order to achieve this I manually change the work order status from APPR to Waiting on APPR and then APPR.

Anyone give me idea how can I avoid this status changes.

Our scenario is system automatically creates APPR PR and APPR PO, without any human intervention


Thanks


Ahmed

On Thursday, November 14, 2013 10:46 AM, Ian Wright <ian.wright@gdfsuezep.co.uk<mailto:ian.wright@gdfsuezep.co.uk>> wrote:

Add the materials to the job plan

From: MAXIMO@yahoogroups.com<mailto:MAXIMO@yahoogroups.com> [mailto:MAXIMO@yahoogroups.com] On Behalf Of Irfan Ahmed
Sent: 14 November 2013 08:26
To: maximo@yahoogroups.com<mailto:maximo@yahoogroups.com>
Subject: [MAXIMO List] Release order or PR


Dear All,

Please go through the below data everything seems okay except when work order created from PM. I manually created
Release order and provide work order reference as well.

Is there any way it will automatically create either release order or PR.


Asset No#

1 Monthly

Job Plan No#

Routes

PM

Contract

WO NO#

PO No#



Inspection













M1446

1M

CRANERP542

Cranes-Inspection

1 M Crane Inspection

4017

1471370

HUL4234552













1471371















1471372



M2342

1M

CRANERP500







1471373
























M3336
1M
CRANERP11









































GDF SUEZ E&P UK Ltd (Company Number 3386464), registered in England and Wales with a registered office address at: 40 Holborn Viaduct, London, EC1N 2PB.

****************************************************************************************************************************************************************************************
This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed.
If you have received this email in error please notify the system manager.
****************************************************************************************************************************************************************************************



From: Irfan Ahmed (2013-11-14 03:52)

Dear Lan,
I am already associate the standard service with job plan and it works only the problem is why 
 until and unless I manually change the work order status from APPR to Waiting on APPR and 
then APPR then PR display on services (plan tab). 
In my sense if work order created from PM already has APPR status then  automatically creates 
the APPR PR and so on.
I don't know what went wrong and where I made mistake.  Any idea
Best Regards,
Ahmed 
On Thursday, November 14, 2013 12:55 PM, Ian Wright <ian.wright@gdfsuezep.co.uk> wrote:

 
Go to your PM then hyperlink to the JOBPLAN associated with it
If there isn’t one create it
Add your standard services on the jop  plan associated with PM
 
 
 
From:MAXIMO@yahoogroups.com [mailto:MAXIMO@yahoogroups.com] On Behalf Of Irfan Ahmed
Sent: 14 November 2013 10:48
To: MAXIMO@yahoogroups.com
Subject: Re: [MAXIMO List] Release order or PR
 
 
Dear All,
 
Instead of using the Blanket Contract I used Price Contract. By doing this change PR and PRLINE has been automatically display in 
work order plan tab(services) as I use standard services. However, In order to achieve this I manually change the work order status from APPR to Waiting on APPR and then APPR. 
 
Anyone give me idea how can I avoid this status changes.
 
Our scenario is system automatically creates APPR PR and APPR PO, without any human intervention
 
 
Thanks 
 
 
Ahmed
 
On Thursday, November 14, 2013 10:46 AM, Ian Wright <ian.wright@gdfsuezep.co.uk> wrote:
 
Add the materials to the job plan
 
From:MAXIMO@yahoogroups.com [mailto:MAXIMO@yahoogroups.com] On Behalf Of Irfan Ahmed
Sent: 14 November 2013 08:26
To: maximo@yahoogroups.com
Subject: [MAXIMO List] Release order or PR
 
 
Dear All,
 
Please go through the below data everything seems okay except when work order created from PM. I manually created
Release order and provide work order reference as well.
 
Is there any way it will automatically create either release order or PR.
 
 
Asset No# 1 Monthly Job Plan No# Routes PM Contract WO NO# PO No#
   Inspection            
M1446 1M CRANERP542 Cranes-Inspection 1 M Crane Inspection 4017 1471370 HUL4234552
            1471371  
            1471372  
M2342 1M CRANERP500       1471373  
             
 
 
 
 
 
 
 
M3336
1M
CRANERP11
 
 
 
 
 
       
     
 
 
 
 
 
 
 
 
 
 
 
         
GDF SUEZ E&P UK Ltd (Company Number 3386464), registered in England and Wales with a registered office address at: 40 Holborn Viaduct, London, EC1N 2PB.
****************************************************************************************************************************************************************************************
This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed.
If you have received this email in error please notify the system manager.
****************************************************************************************************************************************************************************************
 


From: Ian Wright (2013-11-14 12:16)

Goto cron task setup
Check the interval on the ReorderCronTask
I normally set this to run every second
Then the PR’s are normally only associated with the one work order if your site doesn’t mind consolidated PR’s then set the interval to be longer but you’ll not see the pr / prline on wpservice tab until the cron has run
It might be just a timing thing

From: MAXIMO@yahoogroups.com [mailto:MAXIMO@yahoogroups.com] On Behalf Of Irfan Ahmed
Sent: 14 November 2013 11:52
To: MAXIMO@yahoogroups.com
Subject: Re: [MAXIMO List] Release order or PR


Dear Lan,

I am already associate the standard service with job plan and it works only the problem is why
until and unless I manually change the work order status from APPR to Waiting on APPR and
then APPR then PR display on services (plan tab).

In my sense if work order created from PM already has APPR status then automatically creates
the APPR PR and so on.

I don't know what went wrong and where I made mistake. Any idea



Best Regards,

Ahmed

On Thursday, November 14, 2013 12:55 PM, Ian Wright <ian.wright@gdfsuezep.co.uk<mailto:ian.wright@gdfsuezep.co.uk>> wrote:

Go to your PM then hyperlink to the JOBPLAN associated with it
If there isn’t one create it
Add your standard services on the jop plan associated with PM



From: MAXIMO@yahoogroups.com<mailto:MAXIMO@yahoogroups.com> [mailto:MAXIMO@yahoogroups.com] On Behalf Of Irfan Ahmed
Sent: 14 November 2013 10:48
To: MAXIMO@yahoogroups.com<mailto:MAXIMO@yahoogroups.com>
Subject: Re: [MAXIMO List] Release order or PR


Dear All,

Instead of using the Blanket Contract I used Price Contract. By doing this change PR and PRLINE has been automatically display in
work order plan tab(services) as I use standard services. However, In order to achieve this I manually change the work order status from APPR to Waiting on APPR and then APPR.

Anyone give me idea how can I avoid this status changes.

Our scenario is system automatically creates APPR PR and APPR PO, without any human intervention


Thanks


Ahmed

On Thursday, November 14, 2013 10:46 AM, Ian Wright <ian.wright@gdfsuezep.co.uk<mailto:ian.wright@gdfsuezep.co.uk>> wrote:

Add the materials to the job plan

From: MAXIMO@yahoogroups.com<mailto:MAXIMO@yahoogroups.com> [mailto:MAXIMO@yahoogroups.com] On Behalf Of Irfan Ahmed
Sent: 14 November 2013 08:26
To: maximo@yahoogroups.com<mailto:maximo@yahoogroups.com>
Subject: [MAXIMO List] Release order or PR


Dear All,

Please go through the below data everything seems okay except when work order created from PM. I manually created
Release order and provide work order reference as well.

Is there any way it will automatically create either release order or PR.


Asset No#

1 Monthly

Job Plan No#

Routes

PM

Contract

WO NO#

PO No#



Inspection













M1446

1M

CRANERP542

Cranes-Inspection

1 M Crane Inspection

4017

1471370

HUL4234552













1471371















1471372



M2342

1M

CRANERP500







1471373
























M3336
1M
CRANERP11









































GDF SUEZ E&P UK Ltd (Company Number 3386464), registered in England and Wales with a registered office address at: 40 Holborn Viaduct, London, EC1N 2PB.

****************************************************************************************************************************************************************************************
This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed.
If you have received this email in error please notify the system manager.
****************************************************************************************************************************************************************************************




From: Irfan Ahmed (2013-11-14 06:25)

Dear Lan,
Thanks for your reply, it's working but the problem is due to some unforeseen reason's they stop the ReOrder cron task 
on production server. Any other way to accomplish the same.
Best Regards,
Ahmed
On Thursday, November 14, 2013 2:19 PM, Ian Wright <ian.wright@gdfsuezep.co.uk> wrote:

 
Goto cron task setup
Check the interval on the ReorderCronTask
I normally set this to run every second
Then the PR’s are normally only associated with the one work order if your site doesn’t mind consolidated PR’s then set the interval to be longer but you’ll not see the pr / prline on wpservice tab until the cron has run
It might be just a timing thing
 
From:MAXIMO@yahoogroups.com [mailto:MAXIMO@yahoogroups.com] On Behalf Of Irfan Ahmed
Sent: 14 November 2013 11:52
To: MAXIMO@yahoogroups.com
Subject: Re: [MAXIMO List] Release order or PR
 
 
Dear Lan,
 
I am already associate the standard service with job plan and it works only the problem is why 
 until and unless I manually change the work order status from APPR to Waiting on APPR and 
then APPR then PR display on services (plan tab). 
 
In my sense if work order created from PM already has APPR status then  automatically creates 
the APPR PR and so on.
 
I don't know what went wrong and where I made mistake.  Any idea
 
 
 
Best Regards,
 
Ahmed 
 
On Thursday, November 14, 2013 12:55 PM, Ian Wright <ian.wright@gdfsuezep.co.uk> wrote:
 
Go to your PM then hyperlink to the JOBPLAN associated with it
If there isn’t one create it
Add your standard services on the jop  plan associated with PM
 
 
 
From:MAXIMO@yahoogroups.com [mailto:MAXIMO@yahoogroups.com] On Behalf Of Irfan Ahmed
Sent: 14 November 2013 10:48
To: MAXIMO@yahoogroups.com
Subject: Re: [MAXIMO List] Release order or PR
 
 
Dear All,
 
Instead of using the Blanket Contract I used Price Contract. By doing this change PR and PRLINE has been automatically display in 
work order plan tab(services) as I use standard services. However, In order to achieve this I manually change the work order status from APPR to Waiting on APPR and then APPR. 
 
Anyone give me idea how can I avoid this status changes.
 
Our scenario is system automatically creates APPR PR and APPR PO, without any human intervention
 
 
Thanks 
 
 
Ahmed
 
On Thursday, November 14, 2013 10:46 AM, Ian Wright <ian.wright@gdfsuezep.co.uk> wrote:
 
Add the materials to the job plan
 
From:MAXIMO@yahoogroups.com [mailto:MAXIMO@yahoogroups.com] On Behalf Of Irfan Ahmed
Sent: 14 November 2013 08:26
To: maximo@yahoogroups.com
Subject: [MAXIMO List] Release order or PR
 
 
Dear All,
 
Please go through the below data everything seems okay except when work order created from PM. I manually created
Release order and provide work order reference as well.
 
Is there any way it will automatically create either release order or PR.
 
 
Asset No# 1 Monthly Job Plan No# Routes PM Contract WO NO# PO No#
   Inspection            
M1446 1M CRANERP542 Cranes-Inspection 1 M Crane Inspection 4017 1471370 HUL4234552
            1471371  
            1471372  
M2342 1M CRANERP500       1471373  
             
 
 
 
 
 
 
 
M3336
1M
CRANERP11
 
 
 
 
 
       
     
 
 
 
 
 
 
 
 
 
 
 
         
GDF SUEZ E&P UK Ltd (Company Number 3386464), registered in England and Wales with a registered office address at: 40 Holborn Viaduct, London, EC1N 2PB.
****************************************************************************************************************************************************************************************
This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed.
If you have received this email in error please notify the system manager.
****************************************************************************************************************************************************************************************
 
 


From: Ian Wright (2013-11-14 14:32)

Go to Inventory app and run the

select action -- reorder – reorder direct issue items and services

manually or get them to re-instate the cron

Rgds Ian


From: MAXIMO@yahoogroups.com [mailto:MAXIMO@yahoogroups.com] On Behalf Of Irfan Ahmed
Sent: 14 November 2013 14:25
To: MAXIMO@yahoogroups.com
Subject: Re: [MAXIMO List] Release order or PR


Dear Lan,

Thanks for your reply, it's working but the problem is due to some unforeseen reason's they stop the ReOrder cron task
on production server. Any other way to accomplish the same.


Best Regards,

Ahmed

On Thursday, November 14, 2013 2:19 PM, Ian Wright <ian.wright@gdfsuezep.co.uk<mailto:ian.wright@gdfsuezep.co.uk>> wrote:

Goto cron task setup
Check the interval on the ReorderCronTask
I normally set this to run every second
Then the PR’s are normally only associated with the one work order if your site doesn’t mind consolidated PR’s then set the interval to be longer but you’ll not see the pr / prline on wpservice tab until the cron has run
It might be just a timing thing

From: MAXIMO@yahoogroups.com<mailto:MAXIMO@yahoogroups.com> [mailto:MAXIMO@yahoogroups.com] On Behalf Of Irfan Ahmed
Sent: 14 November 2013 11:52
To: MAXIMO@yahoogroups.com<mailto:MAXIMO@yahoogroups.com>
Subject: Re: [MAXIMO List] Release order or PR


Dear Lan,

I am already associate the standard service with job plan and it works only the problem is why
until and unless I manually change the work order status from APPR to Waiting on APPR and
then APPR then PR display on services (plan tab).

In my sense if work order created from PM already has APPR status then automatically creates
the APPR PR and so on.

I don't know what went wrong and where I made mistake. Any idea



Best Regards,

Ahmed

On Thursday, November 14, 2013 12:55 PM, Ian Wright <ian.wright@gdfsuezep.co.uk<mailto:ian.wright@gdfsuezep.co.uk>> wrote:

Go to your PM then hyperlink to the JOBPLAN associated with it
If there isn’t one create it
Add your standard services on the jop plan associated with PM



From: MAXIMO@yahoogroups.com<mailto:MAXIMO@yahoogroups.com> [mailto:MAXIMO@yahoogroups.com] On Behalf Of Irfan Ahmed
Sent: 14 November 2013 10:48
To: MAXIMO@yahoogroups.com<mailto:MAXIMO@yahoogroups.com>
Subject: Re: [MAXIMO List] Release order or PR


Dear All,

Instead of using the Blanket Contract I used Price Contract. By doing this change PR and PRLINE has been automatically display in
work order plan tab(services) as I use standard services. However, In order to achieve this I manually change the work order status from APPR to Waiting on APPR and then APPR.

Anyone give me idea how can I avoid this status changes.

Our scenario is system automatically creates APPR PR and APPR PO, without any human intervention


Thanks


Ahmed

On Thursday, November 14, 2013 10:46 AM, Ian Wright <ian.wright@gdfsuezep.co.uk<mailto:ian.wright@gdfsuezep.co.uk>> wrote:

Add the materials to the job plan

From: MAXIMO@yahoogroups.com<mailto:MAXIMO@yahoogroups.com> [mailto:MAXIMO@yahoogroups.com] On Behalf Of Irfan Ahmed
Sent: 14 November 2013 08:26
To: maximo@yahoogroups.com<mailto:maximo@yahoogroups.com>
Subject: [MAXIMO List] Release order or PR


Dear All,

Please go through the below data everything seems okay except when work order created from PM. I manually created
Release order and provide work order reference as well.

Is there any way it will automatically create either release order or PR.


Asset No#

1 Monthly

Job Plan No#

Routes

PM

Contract

WO NO#

PO No#



Inspection













M1446

1M

CRANERP542

Cranes-Inspection

1 M Crane Inspection

4017

1471370

HUL4234552













1471371















1471372



M2342

1M

CRANERP500







1471373
























M3336
1M
CRANERP11









































GDF SUEZ E&P UK Ltd (Company Number 3386464), registered in England and Wales with a registered office address at: 40 Holborn Viaduct, London, EC1N 2PB.

****************************************************************************************************************************************************************************************